Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
440 Chartres St [Pierre Masperos]
·
VCC General Work
·
Permit #19-19756-VCGEN
·
Ref Code:X2QEY3
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Permit Picked Up
Date Filed:
6/24/2019
Closed:
No
Description::
All repair/replacement work shall match existing in color, size, material, detail, profile and exposure. Failure to exactly match materials, details, profiles, exposures, or VCC mortar as specified in permit will result in a VCC violation and mandated repair of improper work. NOTE: Permit issued in response to violations. Work shall commence within 30 days from the date of permit issuance. Work must be completed no more than 60 days after work begins. Owner will call VCC for final inspection upon completion of work. Penalty fees may apply because of improper or unauthorized work. repair deteriorated brick on Conit elevation repair downspout, balcony decking and balcony fascia remove unpermitted plexiglass over doors remove impermissalbe plywood shutters remove impermissible light fixtures remove unused wiring, place used wiring in conduit and paint to match the adjacent surface remove excess signage in menu box To repoint masonry utilizing mortar mixed and applied per the VCC standard detail sheet (attached) Any deteriorated, cracked, or broken bricks shall be replaced to match existing in color, size, material, porosity, detail, profile and exposure. All reinstalled masonry must be properly "toothed in" to existing masonry wall, using VCC mortar formula (attached). Failure to exactly match materials, paint color, or VCC mortar as specified in permit will result in a VCC violation and mandated repair of improper work. All mortar to be mixed using
Expires:
12/24/2019
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Permit Finaled
Next Status Date:
8/9/2019
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
1668
Days Issued:
1667
Filing Date:
6/24/2019
Lead Staff:
Renee Bourgogne
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.