Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
920 St Louis St
·
VCC General Work
·
Permit #19-14776-VCGEN
·
Ref Code:UU2350
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
VCC ARC Meeting
Date Filed:
5/15/2019
Closed:
No
Description::
To repair masonry wall as per materials stamped VCC approved 06/03/19 and as per PRC approval (Façade Easement) Work to occur on the Dauphine elevation of the main building, the Burgundy elevation of the main building and service ell, and the Conti elevation of the service ell Work to follow VCC standard details (attached) for repointing and also includes “sounding” patches of existing stucco and removing unsound stucco NOTE: Permit re-issued and below items added to scope of work 09/24/2020: To install new steel headers above windows on the Burgundy elevation of the main building as per PRC approval, Architecture Committee approval of 09/10/2020, and materials stamped VCC approved 09/24/2020 All repair/replacement work shall match existing in color, size, material, detail, profile and exposure. Failure to exactly match materials, details, profiles, exposures, or VCC mortar as specified in permit will result in a VCC violation and mandated repair of improper work. NOTE: Permit issued in response to violations. Work shall commence within 30 days from the date of permit issuance. Work must be completed no more than 60 days after work begins. Owner will call VCC for final inspection upon completion of work. Penalty fees may apply because of improper or unauthorized work.
Expires:
12/3/2019
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Permit Finaled
Next Status Date:
11/4/2019
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
1708
Days Issued:
1688
Filing Date:
5/15/2019
Lead Staff:
Nicholas G Albrecht
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.