Description:: Work to be completed per attached materials, approved by Vieux Carre Commission on 09/07/16 and stamped VCC approved 09/22/16, including but not limited to:
Disassemble Royal side masonry wall, retain and clean historic bricks and reinstall brick wall, historic windows, doors, and cornices in existing locations. Install three (3) new 4 x 4 x 1/4 galvanized angles at each lintel as shown.
Install new parge coat and limewash. Paint all existing ironwork, decking, lintels, door and window frames, windows, doors, shutters, soffit, outriggers sleepers and plates using paint colors indicated in attached materials.
Install six (6) new tie backs and plates, two (2) at each story, with new 5/8" threaded rods and 2x10 blocking as shown, using 12" galvanized steel plates (3/4" thick).
Install new thru wall copper flashing at existing copper valley gutter. Install new copper scupper, conductor head and downspout
Remove existing metal cap flashing at parapets and install convex mortar cap with embedded mesh.
Remove deteriorated stucco, repoint masonry (using VCC mortar formula, attached) and install new VCC forumla stucco as needed on St. Philip and Chartres side elevations of main building.
All reinstalled masonry must be properly "toothed in" to existing masonry wall, using VCC mortar formula (attached). Cracked or broken bricks shall be replaced to match existing in color, size, material, porosity, detail, profile and exposure.
Failure to exactly match materials, paint c
Expires: 3/22/2017
Division: VCC
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: Permit Finaled
Next Status Date: 10/27/2016