Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
513 Decatur St
·
VCC General Work
·
Permit #18-33575-VCGEN
·
Ref Code:NAC0L3
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Permit Picked Up
Date Filed:
10/17/2018
Closed:
No
Description::
To address violations cited in VCC case 18-08761-VCCSN, per attached materials stamped VCC approved 12/27/18, as follows: Remove existing light fixtures and instal three (3) Halo ML-4 LED fixtures on underside of balcony, centered over openings and painted to match adjacent surface. All wiring shall be placed in conduits. All conduits shall be placed along the inside corners of building surfaces as much as possible, such as along gallery/balcony purlins at the deck line, and painted to match the adjacent surfaces. New LED fixtures shall use lamps with the following criteria: 3000K color temperature, 80+ color rendering index, and 600-800 lumens per bulb. Repair/replace wood sills and casing at second floor doors, as needed. Match existing in color, size, material, detail, profile and exposure. Touch up paint on exterior millwork, color and finish to match existing. Remove existing wall sconces and install two (2) new 18" Bevolo "French Quarter lantern standard bracket" sconces in same location. NOTE: Permit issued in response to violations. Work shall commence within 30 days from the date of permit issuance. Work must be completed no more than 60 days after work begins. Owner will call VCC for final inspection upon completion of work. Penalty fees may apply because of improper or unauthorized work. All repair/replacement work shall match existing in color, size, material, detail, profile and exposure. Failure to exactly match materials, details, profiles, exposu
Expires:
6/27/2019
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Permit Finaled
Next Status Date:
2/25/2019
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
1918
Days Issued:
1847
Filing Date:
10/17/2018
Lead Staff:
Erin Vogt
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.