Description:: To address VCC violations cited in case 19-03182-DBNVCC, per attached materials stamped VCC approved 08/20/19. NOTE: Retention of mechanical vents installed without permit is NOT included in this scope. A separate permit application and additional information regarding equipment is required for review.
Remove deteriorated floor boards, stringers, and fascia boards.
Install new 3"x4" beaded stringers, 5/4x4 wood T&G floorboards, and 7/8" fascia with ½" bead, all as per VCC Standard Detail Sheet No. 12 (attached). Paint decking medium gray on top and sides, semigloss. Paint underside of decking, stringers, fascia, trim and outriggers white/off-white, semigloss.
Repair/replace wooden rail, spindles and trim, as needed, to match existing dimension, size, reveal, profile, material, color and exposure.
Repair stucco where deteriorated, as needed. New stucco must be VCC formula, attached.
Remove vegetation from masonry. Cut vegetation down and apply a weed and grass killer.
Remove dead roots after 1-2 days. Install new VCC mortar (formula attached) as needed where deteriorated
Paint as follows, as needed:
Walls: Puritan Gray, HC-164, flat or satin finish. Shutters/front entry door: Essex Green, semigloss. Wooden elements including doors, windows, frames, shop windows, fascia/soffit/outriggers of gallery: Navajo White, semigloss
All repair/replacement work shall match existing in color, size, material, detail, profile and exposure.
Retain security cameras, paint housin
Expires: 2/29/2020
Division: VCC
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: Permit Finaled
Next Status Date: 10/7/2019