Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
905 Governor Nicholls St
·
VCC General Work
·
Permit #18-02179-VCGEN
·
Ref Code:MHJF2M
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Permit Issued
Date Filed:
1/22/2018
Closed:
No
Description::
To correct or retain various violations as per Architecture Committee approval of 02/27/18 and materials stamped VCC approved 03/05/18. Work includes: • Removal of all existing unpermitted/unshielded light fixtures • Installation of three (3) new Remcraft 112 fixtures at both the first and second floor levels of the Governor Nicholls elevation • Installation of two (2) new Remcraft 112 fixtures on the Dauphine elevation of garage building • Retention of the parapet cap flashing on main building and service ell until such times as problems develop – once problems develop, metal cap flashing to be removed and an approvable mortar cap installed • Retention of brick in-filled window opening on the Barracks elevation of the garage building • Repointing masonry as needed on the Barracks elevation of the garage building and the Burgundy elevation of the service ell as per VCC standard detail sheet (attached) All repair/replacement work shall match existing in color, size, material, detail, profile and exposure. Failure to exactly match materials, details, profiles, exposures, or VCC mortar as specified in permit will result in a VCC violation and mandated repair of improper work. NOTE: Permit issued in response to violations. Work shall commence no less than 30 days after permit is issued. Work must be completed no more than 60 days after work begins. Owner will call VCC for final inspection upon completion of work. Penalty fees may apply because of improper or unau
Expires:
9/5/2018
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Scheduling and case analysis
Next Status Date:
6/5/2018
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
2186
Days Issued:
2144
Filing Date:
1/22/2018
Lead Staff:
Nicholas G Albrecht
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.