Description:: Work to be completed per attached scope of work and stamped materials stamped VCC approved 10/11/19, as follows:
Remove existing sidewalk and side alley paving. Install new brick paving in herringbone pattern, per attached paving plan. No modifications to drainage in courtyard or alley.
Remove plumbing and electrical utilities from Burgundy-side elevation. Install new electrical utility closet and gas meter niche, per attached drawings.
Install new electrical utilities, sewer, water and gas lines.
Remove stucco on Burgundy elevation of main building as needed. Repoint masonry utilizing mortar mixed and applied per the VCC standard detail sheet (attached). Any deteriorated, cracked, or broken bricks shall be replaced to match existing in color, size, material, porosity, detail, profile and exposure. All reinstalled masonry must be properly "toothed in" to existing masonry wall, using VCC mortar formula (attached). Apply new stucco per VCC formula, attached.
Remove attic vent and install new six-lite wood window in existing opening. Window must be true divided lite, match all existing millwork profiles, and be constructed out of Spanish cedar, western cedar or mahogany. Depth within wall, reveals, dimensions, stiles, rails, etc. to match existing windows. Install two louvered shutters to fit opening. Stile and rail thickness, material, dimension, louver profile, hardware and operation to match existing louvered shutters throughout property.
Repair window frames and sashe
Expires: 4/11/2020
Division: VCC
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: VCC ARC Meeting
Next Status Date: 7/14/2020