Description:: Install Wall Sheathing, Install Frame Int Stud Wall- Rott Termite Damagem, Repair Subfloor as Needed, Repair Electrical System to Code, Replace Windows, Replace Damaged Framing, Smooth Surface Hardi Plank siding, soffit/fascia, Install New Drywall as Needed, Install Porch Awning at Upper Rear, Repair Porches, Front, Install Base and Wall Cabinets and Countertop, Install Base Trim complete with shoe, Install Interior Door, Install Pre-hung Exterior Door, Install Vinyl Flooring, Paint Exterior House Complete, Prepare Walls and Paint Room Complete, Install A/C Condenser See Sub Bid Attached, Install Hot Water Heater, Install Kitchen Sink, Install Toilet, Install Vanity w/Sink, Trim Out Electrical for Final.
Permit Extended to 1/10/27
Next Inspection:
Commercial Final C/O Documents
Inspection Date:
10/27/2026
Next Inspector:
Mollie McInnis
Total Fees:
1673.00
Unpaid Fees:
0.00
Final Date:
10/27/2026
Days Open:
1274
Days Issued:
303
Filing Date:
5/1/2023
Lead Staff: