Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
6501 Florida Ave
·
New Construction
·
Ref Code:GBCRN6
View
Print Summary
Add to Watch List
Type:
New Construction
Status:
VOIDED - Duplicate Permit
Date Filed:
12/3/2024
Closed:
Yes
Description::
This permit includes the following upgrades/improvements to the East Bank Sewage Treatment Plant located at 6501 Florida Avenue: replacement of the clarifier mechanisms within four of the plant's secondary clarifiers; replacement of the existing RAS piping from four of the plant's secondary clarifiers to the North RAS Pump Station; a new electrical building for the North RAS Pump Station replacing an existing electrical room; new pumps, piping, valves, and a new bridge crane at the North RAS Pump Station replacing existing pumps, piping, valves, and bridge crane; repurposing an existing sedimentation basin for thickened sludge storage and WAS storage; two new gravity belt thickeners, a new canopy structure, foundation improvements, a new polymer system, and associated piping and valves located at the new thickened sludge/WAS storage tanks; new piping from the thickened sludge storage tank to the belt filter presses in the Solids Handling Building; a new septage receiving facility including a driveway, septage receiving tank, bar screens, pumps, piping, and valves; and associated electrical and controls improvements for the various upgrades listed above. A contractor will be awarded this project once the bidding phase is completed. This project is currently between 90% design and 100% design. It is expected to be advertised for bid in March 2025. At that time, the contractor's information and quote for the work will be provided. A preliminary cost of $44.1 million was listed base
Expires:
6/3/2025
Division:
SP
Subdivision:
Leonidas
Council District:
A
Area:
500
Next Status:
Next Status Date:
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
264660.00
Unpaid Fees:
264660.00
Final Date:
12/9/2024
Days Open:
5
Days Issued:
0
Filing Date:
12/3/2024
Lead Staff:
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.