Description:: Clean all graffiti, Remove all vegetation growing on and from the property. Remove all signage and merchandise attached to exterior elements of the building. Remove all light fixtures, unused wires, conduits. Secure, conceal all remaining wires, conduits and paint to match attached surface
Repair, repoint brick, mortar
Repair, replace damaged, deteriorated wood roof fascia to match existing. Paint to match previous
Install missing galvanized round downspout on the Bourbon elevation to match previous. Paint to match attached surface
Remove balcony deck boards, stringers, and fascia boards. Install new natural wood 3"x4" beaded stringers, natural wood 5/4x4 T&G floorboards, and natural wood 7/8" fascia with ½" bead
Install fourteen (14) Remcraft 110 series down light fixtures under the balcony. Thirteen centered at the balcony. Each one placed at each opening. One centered at the first floor, corner entry
Install five (5) Remcraft 210 series wall sconce down light fixtures
Each one placed above the doors on the Bourbon elevation with the exception the door under the business sign
Retain security cameras. Two installed on the St Louis elevation, three installed on the Bourbon elevation. Paint to match attached surface.
Walls..."Cathedral Gray", flat/satin (Exposed brick is NOT to be painted)
Trim, Balcony Underside, Balcony ...White, semigloss
Windows, Doors, Shutters, Wainscoting..."Gov. Nicholls Green", semigloss
Balcony Decking...Gray, semigloss
*Violations*
Expires: 4/6/2022
Division: VCC
Subdivision: French Quarter
Council District: C
Area: 0
Next Status: Permit Picked Up