Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
640 Royal St
·
VCC General Work
·
Permit #17-23398-VCGEN
·
Ref Code:CB1ADT
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Site Visit
Date Filed:
7/11/2017
Closed:
No
Description::
To correct Demolition by Neglect citations on the Royal and St. Peter elevations, including removal of inappropriate stucco and repair of millwork, per plans and materials stamped VCC approved 12/05/17. Unless otherwise specifically noted, all work to match existing. Work includes: • Repair/refurbishment/replacement of existing windows/doors/shutters as per stamped approved opening schedule NOTE: If drip caps are not existing or in need of total replacement, new drip caps to be milled to match designs found in historic HABS drawings • Removal of cement-based plaster (approximately 10 percent of the wall surface), repair of the underlying substrate, and application of new lime based stucco • Repair of all cracked or damaged plaster utilizing lime based stucco NOTE: Painting of exterior plaster to be permitted separately NOTE: Contractor/architect to contact VCC staff for inspection of all noted “mockups” prior to proceeding with associated work All repair/replacement work shall match existing in color, size, material, detail, profile and exposure. Failure to exactly match materials, details, profiles, exposures, or VCC mortar as specified in permit will result in a VCC violation and mandated repair of improper work. NOTE: Permit issued in response to violations but does not address all violations. Applicant to submit separate application to address courtyard violations. Work shall commence no less than 30 days after permit is issued. Work must be completed no mo
Expires:
6/6/2018
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
VCC ARC Meeting
Next Status Date:
6/12/2018
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
2381
Days Issued:
2233
Filing Date:
7/11/2017
Lead Staff:
Nicholas G Albrecht
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.