Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
418 Bourbon St [Sing Sing]
·
VCC General Work
·
Permit #14-21654-VCGEN
·
Ref Code:BGY66C
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Permit Issued
Date Filed:
7/7/2014
Closed:
Yes
Description::
Repoint brick walls using VCC approved mortar mix Repair two (2) windows on the St. Louis elevation to match existing, paint...White Remove all vegetation from exterior walls Repair stuccoed walls with VCC approved stucco mix. Note: Walls not currently stuccoed are not permitted to be stuccoed; scope of work limited to those which already have a stucco finish. Remove existing synthetic slate roofing material Repair and/or replace underlayment as necessary Install new natural slate (grey/green), using copper nails Install copper gutters, flashing, and vents Install/reinstall terra cotta ridge tiles Replace existing flat roofs with cold applied, built-up bitumen roofing system Mortar: No more than 1 part Portland Cement, 3 parts lime, 9 parts sand, and enough water to form a workable mix. Prepackaged mixes are not permitted, as quality control is not consistent. Stucco: Base coat consists of 2 coats, doubled up work of 5/8" total thickness. Proportioned as follows: no greater than 1:12 part Portland Cement, to 3 parts lime, and 9 parts sand, 6 lbs./cubic yard hair or fiber, and enough water to form a workable mix. Finish coat is 1/4" in total thickness proportioned as follows: No more than 1 Part Portland cement, 3 Parts Lime, 9 Parts Sand, Enough water to form a workable mix. Note: RATIO OF PORTLAND CEMENT NOT TO EXCEED 1:12. Note: Trash chutes are required for removal of debris from all roofs All work must conform to standard VCC policies & guidelin
Expires:
1/10/2015
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Next Status Date:
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
2206
Days Issued:
2202
Filing Date:
7/7/2014
Lead Staff:
Sarah E Ripple
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.