Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
1029 Esplanade Ave
·
HDLC COA
·
Permit #24-23375-HDLC
·
Ref Code:AVKK3S
View
Print Summary
Add to Watch List
Type:
HDLC COA
Status:
Permit Finaled
Date Filed:
7/30/2024
Closed:
Yes
Description::
-Remove, Haul, Tear - Off & Dispose of 1 Layer of Existing Roof. -Install Owens Corning™ Architectural Oakridge® with StreakGuard™ Algae Resistance. -Install Hip and Ridge Shingles -Install Synthetic Underlayment for added Protection Against Moisture & Wind Driven Rain. -Remove & Replace Ventilation (Ridge Vent and/or Square Vent) -Remove & Replace Pipe Flashing - 3-in-1 Plumbing Accessories. -Install Starter Shingle throughout the perimeter -Chimney Reseal and install Ice & Water shield. (if applicable) -Remove & Replace Aluminum Pre-Painted Drip edge. -Install Ice & Water Shield per code to help protect vulnerable areas from water. -Apply Caulk to All Flashings to Seal Properly and Avoid Corrosion.- Remove, Haul, Tear - Off & Dispose of 1 Layer of Existing Roof. - Conduct Thorough Inspection of Decking Structure - Install New Base Sheet as well as New Cap Sheet - If necessary, remove and replace up to 2 rows of shingles. - Remove & Replace Aluminum Pre-Painted Drip edge. - Apply Caulk to All Flashings to Seal Properly and Avoid Corrosion. - Apply Paint to all Metal Flashings with Exposed Metal to Protect Against Rust for Finish Protection. - We are going to install ridge vents and eave vents as well, to create a correct attic ventilation. - We will remove both satellite dishes. - We are going to replace the turbine vent by square vents on the back part of the roof.
Expires:
1/31/2025
Division:
HDLC
Subdivision:
Marigny
Council District:
C
Area:
0
Next Status:
Next Status Date:
Next Inspection:
Final Inspection
Inspection Date:
10/21/2024
Next Inspector:
Alex Nassar
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
10/21/2024
Days Open:
82
Days Issued:
81
Filing Date:
7/30/2024
Lead Staff:
Dennis Murphy
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.