Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
730 Dauphine St
·
VCC General Work
·
Permit #17-37630-VCGEN
·
Ref Code:73ENMA
View
Print Summary
Add to Watch List
Type:
VCC General Work
Status:
Permit Issued
Date Filed:
11/8/2017
Closed:
No
Description::
Exterior renovation of main building, service building, and courtyard, per attached plans and materials stamped VCC approved, including: Remove concrete slab in courtyard and install a bed of sand, compacted limestone & geo-textile fabric, with new pavers to match existing at rear of site in size, material and pattern. Remove existing "side gallery" posts, concrete landing and steps to main building, outdoor water heater cabinet and laundry enclosure. Install new wood landing with newel posts and beaded rail. Remove/replace wood rail on rear, service building and courtyard infill. Remove existing flat roof material on infill and install new plywood decking, peel and stick asphalt underlayment, install new Aeratis Heritage T&G decking. Remove existing courtyard infill door and install new six lite, two panel wood door using Spanish Cedar, with single pane glass and true divided lites. Remove existing double-hung sashes from rear building window and install historically appropriate six-over-six double hung Spanish Cedar windows, with single pane glass and true divided lites. Install one (1) new "Mitsubishi 24,000 BTU P-Series" mini-split condenser, model # PUY-A24NHA7, and one (1) "Lennox Elite Series XC14" condenser on infill roof. Install copper venting on rear, addition roof of main building. Remove existing roof shingles. Repair and/or replace underlayment as necessary. Install new natural slate (grey/green), using copper nails. Install/repair half round copper gu
Expires:
6/19/2018
Division:
VCC
Subdivision:
French Quarter
Council District:
C
Area:
0
Next Status:
Certificate of Appropriateness
Next Status Date:
12/21/2017
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
0.00
Unpaid Fees:
0.00
Final Date:
Days Open:
2261
Days Issued:
2219
Filing Date:
11/8/2017
Lead Staff:
Erin Vogt
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.