Start
Help
Search
Toggle Dropdown
Advanced Search
Log in
Register
Page Loading, Please Wait...
Loading...
Results
1 item(s) found
Permit
License
Project
Violation
Work Order
Selected Items
All items
(Select an action)
Export
Add to Watch List
Remove from Watch List
Pay
All
Permits
Licenses
Projects
Violations
Recently Modified
Filing Date (Newest First)
Filing Date (Oldest First)
Person/Business (Z-A)
Person/Business (A-Z)
10
20
50
100
200
1457 Tita Street
·
Variance
·
Ref Code:37BU2W
View
Print Summary
Add to Watch List
Type:
Variance
Status:
Finaled
Date Filed:
9/19/2024
Closed:
Yes
Description::
Request: This request is for variances from the provisions of Article 13, Section 13.3.A.1 (Table 13-2), Article 22, Section 22.8.A.1.b.ii, Article 22, Section 22.11.D.1, and Article 22, Section 22.11.D.2 of the Comprehensive Zoning Ordinance to permit the construction of a single-family dwelling with insufficient rear yard setback and a parking pad located in the required front yard between the front façade and front lot line resulting in front yard parking. Requested Waiver(s): Article 13, Section 13.3.A.1 (Table 13-2) – Insufficient Rear Yard Setback Permitted/Required: 18 ft, ⅛ in Proposed/Proposed: 17 ft, 10 in Waiver: 2 ⅞ in Article 22, Section 22.8.A.1.b.ii – Parking Pad Design (Location) Permitted/Required: No parking between front façade and front property line Proposed/Proposed: Parking between front façade and front properly line Waiver: Parking between front façade and front properly line Article 22, Section 22.11.D.1 – Parking Pad Design (Location) Permitted/Required: No front yard parking Proposed/Proposed: Front yard parking Waiver: Front yard parking Article 22, Section 22.11.D.2 – Parking Pad Design (Location) Permitted/Required: No parking between front façade and front lot line Proposed/Proposed: Parking between front façade and front lot line Waiver: Parking between front façade and front lot line
Expires:
9/19/2025
Division:
CPC
Subdivision:
Behrman
Council District:
C
Area:
0
Next Status:
Next Status Date:
Next Inspection:
Inspection Date:
Next Inspector:
Total Fees:
250.00
Unpaid Fees:
0.00
Final Date:
8/20/2025
Days Open:
335
Days Issued:
0
Filing Date:
9/19/2024
Lead Staff:
Cameron Boissiere
«
»
Page Loading, Please Wait...
Loading...
Account Required
×
You need an account to favorite records.
Account Required
×
You need an account to pay.
Selection
×
You need to select a record to perform this action.
Too many items
×
This action is limited to 200 records.
Select
×
You need to select an action.