Permit Intake | Resolved | All contracts shall include both the contractor and owner signature(s), printed name(s), titles, and date. Please state who the signer is in relation to the owner. |
Permit Intake | Resolved | Please upload all requested documents to your Onestopapp application. |
Zoning | Resolved | This property is located within the University Area Interim Zoning District Off-Street Parking Zoning District. Please verify the number of existing and proposed bedrooms. Any new or additional bedrooms will require one additional off-street parking space for each additional bedroom. http://czo.nola.gov/czo/media/IZD/2020/University-Area-Parking-IZD-Motion.pdf
Please provide the additional parking spaces or you can appeal the IZD to the City Planning Commission and City Council. Contact CPC for more information cpc@nola.gov or 658-7033 |
Zoning | Resolved | This appears to be the renovation of a structures with more units than permitted in the zoning district. This property may be compliant as an established non-conforming two-family or multi-family, per REVISED Article 20.3.W of the CZO. Please provide documentation (utility accounts, leases, photos, etc) that verify usage as a multiple unit dwelling. An official zoning verification will be required to be issued by the zoning division prior to permitting. http://czo.nola.gov/Article-20#20-3-W |
Plan Review | Resolved | As the proposed value of work exceeds 50% of the Assessor's assessed value of the structure, the proposed work constitutes a substantial improvement for the purposes of Chapter 78 of the City Code. Please do one of the following: a) provide a Benchmark Certificate or Elevation Certificate to verify that the structure meets the required Advisory Base Flood Elevation; b) submit an appraisal to confirm that the proposed work does not exceed 50% of the value of the existing structure; or c) elevate the entire structure to meet the required elevation. Please contact Floodplain Manager's office with questions or concerns 504-658-7127 |
Plan Review | Resolved | Submit soil test report to verify the foundation is designed in accordance with the City of New Orleans Amendments to the IBC 2015 |
Plan Review | Resolved | Approval from the Sewerage and Water Board is required. Submit plumbing riser diagram directly to Sewerage and Water Board; (504-585-2160/ hblancq@swbno.org/jarnold@swbno.org), for approval. Upon approval; reply with a copy of approval letter to this office. |
Plan Review | Resolved | This project has been reviewed by Deron Lee. For email and digital document correspondence, please send to Deron.Lee@nola.gov. |
Floodplain Administration | Resolved | Benchmark Certificate submitted shows the structure is below the 3ft above the curb requirement. 3ft ATC = +6.88 and floor is at +6.75 need an 'as-is" appraisal showing that the work is less than 50% the value of the structure OR elevate the structure or with is being so close to the requiremnt may want to try BBSA. |
Floodplain Administration | Resolved | SUb. Improvement - The permit is also to shore and raise the lowest floor to meet the requirement of +6.88 NAVD (curb ele.= +3.88) AT FINAL INSPECTION VERIFIY THE LOWEST FLOOR IS AT OR ABOVE +6.88 NAVD. |