| GIS Addressing | Resolved | Need to update address to face street access. |
| Permit Intake | Resolved | Permit Intake - Please submit the name and license number of the state approved contractor. |
| Permit Intake | Resolved | Permit Intake - Please submit a signed contract. Contract must include the full description of all work being done, material, labor and cost, both the contractor and owner signature(s), printed name(s), titles, and date. |
| Permit Intake | Resolved | Permit Intake - Please provide a Detailed Cost Estimate that includes a scope of work, break down of all costs (materials and labor) including any required sub-permit work for mechanical and/or electrical. The estimate needs to be an exact amount and match the total contract amount. Signature(s), printed name(s), title(s), and date, are required on estimate. |
| Permit Intake | Resolved | Permit Intake - Please submit a survey from a land surveyor or a civil engineer which shows the location and dimensions of the lot. |
| Permit Intake | Resolved | Permit Intake - A Benchmark Certificate is required for this permit application. The Benchmark Certificate must bear the live seal of a Louisiana registered land surveyor and dated within the last six (6) months. This must be on the Safety & Permits three-part form. |
| Permit Intake | Resolved | Permit Intake - Please upload your plumbing riser diagram as a PDF document. The SWBNO plumbing department will review your uploaded riser diagram. |
| Plan Review | Resolved | PLAN REVIEW
This project has been reviewed by Warren E. Jones, PE. Any questions, more information needed, or for digital document correspondence, email warren.jones@nola.gov or call (504) 658-7121. |
| Plan Review | Withdrawn | PLAN REVIEW
GENERAL NOTE:
The 2021 International Residential Code (“2021 IRC”) applies to one and two-family dwellings not more than three stories above grade plane, and their accessory structures. Unless noted otherwise all construction work must comply with, and all review comments and citations reference, the 2021 IRC including all relevant subsections.
|
| Plan Review | Resolved | PLAN REVIEW
Submit a signed cost estimate or contract with labor and material breakdown, and a copy of the contractor’s license certificate. The estimate or contract should:
a) include a detailed estimate of all costs including materials, labor, general conditions, contractor overhead and profit;
b) include separate line items for any required sub-permit work (e.g. mechanical, electrical, roofing)
c) be written on business letterhead, dated, and stating the correct permit number, project address, contractor license number(s) and contact information including phone number; and
d) match the total contract amount (“Construction Value”) listed in the permit application
NOTE: All estimates or contracts shall include BOTH the Contractor and Owner signatures, printed names, titles and date.
|
| Plan Review | Resolved | PLAN REVIEW
Sewerage & Water Board:
- For any NEW WATER SUPPLY LINES: Submit a plumbing riser diagram for review/approval by Sewerage and Water Board. Any questions or for more information, contact James Darce at jdarce@swbno.org
- For any NEW PLUMBING FIXTURES: Submit a floor plan and riser diagram to backflow@swbno.org. Any questions or for more information on the SWBNO backflow prevention program, contact SWBNO Environmental Affairs at (504) 380-6506
|
| Plan Review | Resolved | PLAN REVIEW
HDLC:
The property is located in the Garden District - an HDLC partial control district. Proposed exterior work will require approval from HDLC (504) 658-7040. For questions or additional detail, please contact HDLC Bldg. Plan Examiner, Dennis Murphy at dennis.murphy@nola.gov
|
| Plan Review | Resolved | PLAN REVIEW
Zoning, GIS Addressing, Floodplain Administration and S&P (Intake) reviews are pending. Additional review comments may be forthcoming. |
| Zoning | Resolved | Permit Intake - Please provide an approved and recorded subdivision survey, verifying the lot(s) of the proposal. You may apply for an official subdivision at https://nola.gov/onestop/building/planning-project/major-or-minor-subdivision/development. |
| Zoning | Resolved | ZONING - Please verify compliance with the front yard build-to line requirement in CZO Section 11.3.A.2: http://czo.nola.gov/Article-11#11-3-A-2 Within the residential districts of the Historic Urban Neighborhood Districts, the front yard build-to line is established by either the average front yards of the adjacent structures or the front yard shown on the most recent survey or sanborn map. You are allowed a 3 feet variation from this setback; however, in no case may the front yard of a single-family or two-family dwelling exceed 20 feet. Please verify compliance by providing either the most recent survey or sanborn map that shows the setback of the most recent structure on the property or by providing the setback of the structures on either side of the subject property (see Section 11.3.A.2.a.iii and Figure 11-1 for corner lots or lots with only one adjacent structure). - - Alternatively, if a hardship exists, you may seek a variance from the Board of Zoning Adjustments. Contact CPC for more information at cpcinfo@nola.gov or 504-658-7033. For application materials and approval criteria please see this link: https://www.nola.gov/onestop/building/planning-project/variances/ |
| Floodplain Administration | Resolved | Please submit a construction benchmark certificate. Thank you. |
| Plan Review | Withdrawn | PLAN REVIEW:
This project has been reviewed by Building Plan Reviewer, Dominique Scott. For email correspondence, please send to dominique.scott@nola.gov
Note: Please make sure to email the reviewer if you upload any documents on OneStop. |
| Plan Review | Resolved | PLAN REVIEW:
Please confirm compliance with the 2021 International Energy Conservation Code (2021 IECC) and State amendments adopted on July 1, 2023.
Information on Construction Documents (Sec. R103.2)
For new construction, additions, or substantial renovation, please provide on the construction documents details (e.g. in table format) including the following information, as applicable:
1. Energy compliance path
2. Insulation material sand their R-values
3. Fenestration U-factors and solar heat gain coefficients (SHGC)
4. Area-weighted U-factor and solar heat gain coefficient (SHGC) calculations
5. Mechanical system design criteria
6. Mechanical and service water heating systems and equipment types, sizes and efficiencies
7. Equipment and system controls
8. Duct sealing, duct and pipe insulation and location
9. Air sealing details
Total Building Performance-Based Compliance Alternative (Sec. R405.2)
- Compliance based on total building performance analysis shall meet the requirements of Table R405.2
- Software tools (e.g. RESCheck) used for performance design shall be in accordance with Sec. R405.3.1.
o (Note: For more information and downloadable REScheck software, go to https://www.energycodes.gov/software-tools)
- For permit application, a report that complies with Sec. R405.3.2.1
- For certificate of occupancy, a compliance report that complies with Sec. R405.3.2.2
Energy Rating Index (ERI) Compliance Alternative (Sec. R406)
- Compliance based on Energy Rating Index (ERI) analysis shall meet the requirements of Sec. R406.2, including
o ERI requirements of 2021 IECC sections indicated within Table R406.2
o Maximum ERI (per climate zone) of Table R406.5
Prescriptive Compliance Alternative (Sec. R401.2)
- Prescriptive compliance alternative requires compliance with Sections R401 thru R404
- Section R402 insulation compliance can be met in one of three ways:
o Assembly U-factor compliance per Section R402.1.2
o R-value per Section R402.1.3; or
o Total UA compliance per Section R402.1.5 |
| Plan Review | Resolved | PLAN REVIEW:
Please provide Manuals S, D, and J calculations for review. |