| Zoning | Withdrawn | Article 4, Section 4.5.B requires an administrative site plan be approved by the Executive Director of the City Planning Commission. Please submit evidence indicating CPC approval. Contact CPC for submittal information at 504-658-7033. |
| Zoning | Open | Section 23.3 requires the submission of a Stormwater Management Plan for any site with 5000 square feet of impervious surface. Please contact the City Planning Commission for further review requirements at 504-658-7033 or stormwater@nola.gov |
| Permit Intake | Open | Please submit a detailed and signed contract/detailed estimate for the work to be performed, including labor. |
| Plan Review | Withdrawn | This project has been reviewed by Senior Building Plan Examiner, Anouar A. IDDIR. Any questions or inquiries, please contact him at aaitiddir@nola.gov or call (504) 658-7124 |
| Plan Review | Withdrawn | For the most up-to-date status of your permit application, go to the OneStop website at https://onestopapp.nola.gov, enter your permit number or address, and select “Print Summary”. You can also upload documents, written responses to review comments etc. to the OneStop website. Please note:
1. All written responses to review comments must be on letterhead and signed and sealed by the design professional of record (if applicable.)
2. Do NOT mix construction plans with letters or other text documents; upload as separate PDF files.
3. Combine multiple plan sheets into a single PDF file.
4. For assistance uploading files or other questions regarding the OneStop application, please visit https://www.nola.gov/onestop/help-with-the-one-stop-app/.
5. If you upload any documents to OneStop, please notify your plan reviewer by email.
|
| Plan Review | Withdrawn | Approval from the State Fire Marshal is required. Apply online at https://lasfm.louisiana.gov/ or contact the State Fire Marshal’s office at 1450 Poydras Street, Suite 1500, New Orleans, LA 70112, Ph. (504) 568-8511 or 8181 Independence Boulevard, Baton Rouge, LA 70806, Ph. (225) 925-4920 / 800-256-5452. |
| Plan Review | Withdrawn | Please be advised. When applicable, any appeal concerning any code requirements can be made to The Board of Building Standards and Appeals. Please contact the Directors Office, Ms Angela Mitchel at (504)-658-7203 for more information, and all requirements. Submit copies of all approval letters signed.
|
| Plan Review | Withdrawn | MEETING WITH ARCHITECT AT 2PM TODAY. |
| Plan Review | Withdrawn | FPD not needed. |
| Plan Review | Withdrawn | BFE not needed. |
| Plan Review | Open | Swimming Pool. - Submit letter of approval. Plans shall be approved by Orleans Parish Sanitarian Services, Department of Health and Hospitals at 1450 Poydras St., Suite 1273, New Orleans, LA 70112. Please contact Mr. Clyde E. Carlson, Engineering Department at (504) 599-0100
Verify compliance with swimming pool requirements in accordance with section 3109 of IBC 2014.
|
| Plan Review | Open | Approval from Fire Prevention Division is required. Please contact Mr. St. Germain or Mr. Elbert Thomas at (504) 658-4770. FAX (504) 565-785. |
| Plan Review | Open | Please clarify if a generator is part of the scope of work. If so, approval from Fire Prevention Division is required. For more details, please contact Mr. St. Germain or Mr. Elbert Thomas at (504) 658-4770 / fax (504) 565-7851.
|
| Plan Review | Withdrawn | Electrical still under review. For most up-to-date status, check online at http://www.nola.gov/onestop and check Print Summary.
|
| Plan Review | Open | Submit pile test report to verify the foundation is designed in accordance with the City of New Orleans Amendments to the IBC 2015, Section 1811 following the link https://www.nola.gov/nola/media/One-Stop-Shop/Safety%20and%20Permits/2012-amendments-searchable-PDF.pdf. Please calrify the design load per pile. |
| Plan Review | Withdrawn | Mechanical still under review. For most up-to-date status, check online at http://www.nola.gov/onestop and check Print Summary.
|
| Plan Review | Open | New Sidewalks, Driveways & Curb Cuts. New sidewalks (including patches and repairs), driveways and curb cuts require approval from the Department of Public Works. Site plan indicating location of the planned improvements must be submitted to DPW.
For more information including a DPW driveway/curb cut permit application, fee schedule and sample standard drawing, go to https://www.nola.gov/onestop/building/street/driveway-sidewalk-cut-permit or contact DPW at (504) 658-8040. Permit applications and site plans can be submitted via the OneStop service desk on the 7th floor of City Hall. (Note: Depending on address and other details of your work, you may also need additional approvals (e.g. Vieux Carre Commission, Parks and Parkways) or other permits to comply the building, mechanical or electrical codes of the City.) For more information, contact Louis R. Haywood, DPW Project Manager at lrhaywood@nola.gov / (504) 658-8056.
|
| Plan Review | Open | Please contact the Building Divison for demolition permit process and application at 504-658-7130. Please verify the total amount of square footage of the structure, if any, which will be demolished, removed, or structurally replaced under this application. Please clearly indicate these values. In addition, if any roof structure is to be replaced, please identify the area of roof to be replaced. If any exterior walls are to be replaced (even if rebuilt in place) or demolished and rebuilt, please clearly specify a) the linear footage in question AND b) clearly identify the location of this work on the site plan and floor plan with a clear, labeled, and defined hatch pattern. |
| Mechanical Plan Review | Open | Rama Bhattacharya is Mechanical and Plumbing reviewer of this project and can be contacted directly for questions / inquiries at his phone line (504) 658-7121/email address: rpbhattacharya@nola.gov |
| Mechanical Plan Review | Resolved | Mechanical (HVAC): completed |
| Mechanical Plan Review | Open | Plumbing:
1.You are required to submit plumbing plans / riser diagrams /fixture schedule / counts / trap sizes including grease trap sizes , locations and grease disposal (where applicable) directly to SWB (Mr. Hank Blancq at 504-585-2160 / hblancq@swbno.org) for review / approval. Upon receipt of SWB stamped approval, you are required to forward to us by uploading onto our One Stop website to be received by us and also notifying us by email towards completing issuing your permit.
2. Please submit riser diagrams for water / vent/drain / waste, all shall be submitted directly to SWB to obtain SWB stamped approval, then you are required to upload onto our One stop website for our visibility to complete it. |
| Mechanical Plan Review | Open | Elevators :
1. Passenger elevators required to be accessible by Chapter 11 shall conform to ICC A 117.1 per Section 3001.3, IBC 20012.
2. Elevator, dumbwaiter and other hoistway enclosures shall be shaft enclosures complying with Section 708, IBC 20012.
3. Section 708: Shafts required to be protected from openings and penetrations through floor / ceiling and roof / ceiling assemblies. Shaft enclosures shall be constructed as fire barriers per IBC Section 707 and IFC and per Table 707.3.9, IBC 2009..
Materials: shall be of materials permitted by the building type of construction.
Fire- resistance rating: not less than 2 hours where connecting 4 stories or more, not less than 1 hour where connecting less than 4 stories.
Openings and penetrations other than those necessary for the purpose of the shaft shall not be permitted in shaft enclosures.
4. Where four or more elevator cars serve all or the same portion of a building, the elevators shall be located in at least two separate hoistways. Not more than four elevator cars shall be located in any single hoistway enclosure per Section 3002.2, IBC 2009.
5. Emergency signs shall be posted adjacent to each elevator call station on all floors instructing occupants to use the exit stairways and not to use the elevators in case of fire / Section 3002.3, IBC 2009.
6. Emergency Operations per Section 3003: - Stand by Power – i) Stand by power shall be manually transferable to all elevators in each bank.
ii) For one elevator – the elevator shall automatically transfer to stand by Power within 60 seconds, after failure of normal power.
iii) For two or more elevators – Where two or more elevators are controlled by a common operating system, all elevators shall automatically transfer to standby power source is of sufficient capacity to operate all elevators at the same time. If standby power source is not in sufficient capacity to operate all elevators at the same time, all elevators shall transfer to standby power in sequence, return to the designated landing and disconnect from the standby power source. After all elevators have been returned to the designated level, at least one elevator shall remain operable from the standby power source.
7. Section 3003.1.4 Venting- Where standby power is connected to elevators, the machine room ventilation or air conditioning shall be connected to the standby power source.
|
| Mechanical Plan Review | Open | 8. Section 3003.2 Fire-fighters’ emergency operation. Elevators shall be provided with Phase I emergency recall operation and Phase II emergency in-car operation in accordance with ASME A17.1/CSA B44.
9. Section 3004.1 -Hoistway Venting: Hoistways of elevators penetrating more than three stories shall be provided with a means for venting smoke and hot gases to the outer air in case of fire.
Exception - Venting of hoistways is not required where the building is equipped throughout with an approved automatic sprinkler system installed with Section 903.3.1 or 903.3.1.2.
However, for occupancies for Groups R-1, R-2, I-1, I-2 and similar occupancies with overnight sleeping units, venting of smoke and gases required even with sprinkler system installed.
Sidewalk elevator hoistways are not required to be vented.
Elevators contained within and serving open parking garages only not required to be vented.
Elevators within individual residential dwelling units nor required to be vented.
10. Section 3004.2: Location of vents: Vents shall be located at the top of hoistway and shall open directly to the outer air or through noncombustible ducts to the outer air. Only 2” clearances allowed for passage of ropes, cables etc . in fire resistance rated floors, walls and ceilings.
11. Section 3004.3: Area of vents: Except as provided for in Section 3004.3.1, the area of vents shall not be less than 3 ½% of the area of hoistway nor less than 3 square feet for each elevator, and not less than 3 ½% nor less than 0.5 square feet for each dumbwaiter car in the hoistway, whichever is greater. Of the total required vent area, not less than 1/3 vent area shall be permanently open.
Section 3004.3.1-Reduced vent area - When mechanical ventilation conforming to the IMC is provided, a reduction in the required vent area is allowed provided that i) The occupancy is not in Group R-1, R-2, I-1 or I-2 or of a similar occupancy with overnight sleeping units, ii) The vents required by Section 3004.2 do not have outside exposure, iii) The hoistway does not extend to the top of the building, iv) The hoistway and machine room exhaust fan is automatically reactivated by thermostatic means.
12. Section 3004.4: Plumbing and mechanical systems shall not be located in an elevator shaft.
13. Section 3006: Machine Rooms-
i) An approved means of access shall be provided to elevator machine rooms and overhead machinery spaces.
ii) Venting – Elevator machine rooms that contain solid-state equipment for elevator operation shall be provided with an independent ventilation and air-conditioning system
iii) Pressurization – The elevator machine rooms serving a pressurized elevator hoistway shall be pressurized upon activation of a heat or smoke detector located in the elevator machine room.
|
| Mechanical Plan Review | Open | iv) Machine rooms and machinery spaces – Shall be enclosed with fire barriers constructed in accordance with Section 707. The fire – resistance rating shall not be less than the required rating of the hoistway enclosure served by the machinery. Openings in fire barriers shall be protected with assemblies having a fire protection rating not less than that required for the hoistway enclosure doors.
14. Section 3007: Fire Service Access Elevator –i) Every floor of the building shall be served by a fire
service access elevator.
ii) Hoistway enclosure protection – shal be located in a shaft enclosure complying Section 708.
iii) Fire service access elevator shall open into fire service access elevator lobby in accordance with sections 3007.4.1 through 3007.4.4
iv) Hoistway lighting – When firefighters’ emergency operation is active, the entire height of the hoistway shall be illumined t not less than 1 footcandle (11 lux) as measured from the top of the car of each fire service access elevator.
v) lobby size – Each enclosed fire service access elevator lobby shall be minimum 150 s.f. with minimum dimension 8 feet.
|