| Zoning | Resolved | This property is located in an overlay district requiring your submittal for site plan review by the staff of the City Planning Commission. Please provide a copy of the approved drawings bearing the signature of the Executive Director of the City Planning Commission to the Department of Safety and Permits. Contact City Planning with any questions at 504-658-7033. |
| Permit Intake | Resolved | Please provide the Name and State License number of the General Contractor or the Homeowner Affidavit for Exemption from Licensure. The affidavit for exemption from licensure is not allowed for properties that are under ownership of an LLC or INC. If work to be performed is on a residential structure, make sure the State License # authorizes you to perform residential work. If work to be performed is on a commercial structure, make sure your State License # authorizes you to perform commercial work. |
| Permit Intake | Resolved | Please submit a detailed and signed contract/detailed estimate for the work to be performed, including labor. |
| Plan Review | Withdrawn | This project has been reviewed by Senior Building Plan Examiner, Anouar A. IDDIR. Any questions or inquiries, please contact him at aaitiddir@nola.gov or call (504) 658-7124 |
| Plan Review | Withdrawn | For the most up-to-date status of your permit application, go to the OneStop website at https://onestopapp.nola.gov, enter your permit number or address, and select “Print Summary”. You can also upload documents, written responses to review comments etc. to the OneStop website. Please note:
1. All written responses to review comments must be on letterhead and signed and sealed by the design professional of record (if applicable.)
2. Do NOT mix construction plans with letters or other text documents; upload as separate PDF files.
3. Combine multiple plan sheets into a single PDF file.
4. For assistance uploading files or other questions regarding the OneStop application, please visit https://www.nola.gov/onestop/help-with-the-one-stop-app/.
5. If you upload any documents to OneStop, please notify your plan reviewer by email.
|
| Plan Review | Withdrawn | Approval from the State Fire Marshal is required. Apply online at https://lasfm.louisiana.gov/ or contact the State Fire Marshal’s office at 1450 Poydras Street, Suite 1500, New Orleans, LA 70112, Ph. (504) 568-8511 or 8181 Independence Boulevard, Baton Rouge, LA 70806, Ph. (225) 925-4920 / 800-256-5452. |
| Plan Review | Withdrawn | Submit an Elevation Drawing showing the location of the Base Flood Elevation level requirements in Flood Hazard Areas in accordance with section 1612 of IBC 2012 with appropriate demarcation of elevation height notes, or Letter of exemption from SHPO for historical structures. |
| Plan Review | Resolved | Please submit calculations certifying the pile capacity the foundation was designed for. Ref: Submit pile test or Submit soil test report or submit calculations for the helical piles to verify the foundation is designed in accordance with the City of New Orleans Amendments to the IBC 2006, Section 1811. Ref: 5 tons. |
| Plan Review | Withdrawn | No use and No occupancy. Future tenant shall apply for a separate permit application and submit plans. |
| Plan Review | Withdrawn | In windborne debris regions, glazing in buildings shall be impact-resistant or protected with an impact-resistant covering in accordance with Section 1609.1.2 of IBC 2012. Please comply. |
| Plan Review | Withdrawn | 1. Please indicate the scope of the Mechanical work.
2. If the cost of the Mechanical work is less than $15,000.00, please provide estimates for actual labor and material cost from a licensed Mechanical Contractor, all written under their business letterheads stating the correct permit number, the project address, license numbers, phone numbers with current dates.
3. If the cost of the Mechanical work is more than $15,000.00, please submit Mechanical plans and specifications prepared by a Louisiana Registered Mechanical Engineer with his fresh seal and fresh signed statement designating him as the professional of record per Section 106.1.1, IBC 2012 ed.(New Orleans Amendments) If plans are submitted digitally, a digital version of the Engineer's seal is acceptable. |
| Plan Review | Withdrawn | 1. Please indicate the scope of the electrical work.
2. If the cost of the electrical work is less than $15,000.00, please provide estimates for actual labor and material cost from a licensed Electrical Contractor, all written under their business letterheads stating the correct permit number, the project address, license numbers, phone numbers with current dates.
3. If the cost of the electrical work is more than $15,000.00, please submit electrical plans and specifications prepared by a Louisiana Registered Electrical Engineer with his fresh seal and fresh signed statement designating him as the professional of record per Section 106.1.1, IBC 2006 ed.(New Orleans Amendments) If plans are submitted digitally, a digital version of the Engineer's seal is acceptable. |
| Plan Review | Withdrawn | For all plumbing work, please submit a plumbing riser diagram in accordance with the 01/01/2016 emergency provision in the State of Louisiana Uniform Construction Code Council. You can contact the SWB Plumbing department at (504-585-2160/ hblancq@swbno.org). Upon approval; reply with a copy of approval letter to this office. |
| Plan Review | Withdrawn | Please contact the Building Divison for demolition permit process and application at 504-658-7130. Please verify the total amount of square footage of the structure, if any, which will be demolished, removed, or structurally replaced under this application. Please clearly indicate these values. In addition, if any roof structure is to be replaced, please identify the area of roof to be replaced. If any exterior walls are to be replaced (even if rebuilt in place) or demolished and rebuilt, please clearly specify a) the linear footage in question AND b) clearly identify the location of this work on the site plan and floor plan with a clear, labeled, and defined hatch pattern. |
| Plan Review | Withdrawn | Should your construction be within 10’ of a utility servitude, please contact Entergy to verify if additional setbacks and safety precautions must be undertaken to protect workers, occupants, and the structure. Contact for Entergy: Jeremy Rich Right-of-way Agent, Entergy New Orleans, Inc, Entergy Louisiana, LLC, 504-595-3816 |
| Plan Review | Withdrawn | Please clarify if a generator is part of the scope of work. If so, approval from Fire Prevention Division is required. For more details, please contact Mr. St. Germain or Mr. Elbert Thomas at (504) 658-4770 / fax (504) 565-7851.
|
| Plan Review | Resolved | Please submit calculations certifying the pile capacity the foundation was designed for. Ref: Please verify that the existing foundation design can support the new additional load in accordance with Section 1808 of the IBC 2012. |
| Plan Review | Withdrawn | Doors shall swing in the direction of egress path of travel as per IBC 2012, Section 1008.1.2. Rf: Main entrance and please Revise and resubmit. |
| Plan Review | Resolved | The maximum area of exterior wall openings based on fire separation distances and degree of opening protection is governed by Table 705.8 of the IBC 2012. Please confirm compliance. |
| Permit Intake | Resolved | A Change of Address form must be completed to assign new addresses for the newly created units. |
| Electrical Plan Review | Resolved | Provide calculated fault current values for all "new" panels |
| Electrical Plan Review | Resolved | Please provide a 125-volt, single-phase, 15 or 20-ampere-rated GFCI protected receptacle outlet for the servicing of heating, air conditioning, and refrigeration equipment as per NEC 2011 Art. 210.63 and 210.8. |
| Mechanical Plan Review | Resolved | Plumbing:
You are required to submit plumbing plans / riser diagrams /fixture schedule / counts / trap sizes including grease trap sizes , locations and grease disposal (where applicable) directly to SWB (Mr. Hank Blancq at 504-585-2160 / hblancq@swbno.org) for review / approval. Upon receipt of SWB stamped approval, you are required to forward to us by uploading onto our One Stop website to be received by us and also notifying us by email towards completing issuing your permit.
|
| Mechanical Plan Review | Resolved | Your ducting system do not indicate location of fire dampers, smoke detectors and thermostats as required for our review. |
| Plan Review | Resolved | Requirements for foundation release:
• Fill out the application form or submit a letter request
• Comply with all zoning review requirements
• Submit pile test report
• Submit structural foundation plan sheets (as applicable), signed and sealed by the Engineer of record.
• Payment of all fees
|
| Stormwater Review | Resolved | was approved under SW084-17 |
| Stormwater Review | Withdrawn | |
| Public Works - Engineering | Resolved | was approved under SW084-17 |
| CPC Plan Review | Resolved | DR185-17 was approved 3-23-28 |