| Plan Review | Resolved | Electrical Review:
All wiring shall be as per NEC 2008 edition from July 7, 2010 onwards.
1. No electrical plans have been submitted. If you are doing any electrical work, please provide details.
2. All electrical wiring shall conform to the requirements of the International Building Code 2009 edition as amended by the National Electrical Code [NFPA -70] and such other applicable safety codes as enforced by the Safety & Permits [New Orleans Amendments to the International Building Code 2009 edition – articles 101.4.1, 106.1, 2701]
3. If total electrical wiring [MATERIAL & LABOR] exceeds $15,000, please provide the following: [New Orleans Amendments to the International Building Code 2009 edition – articles 101.4.1, 106.1, 2701] Two sets of complete Electrical Plans and specifications. Plans shall include details of service, feeders, panel boards, transformers, disconnect switches, lights, receptacles, wires, cables, wiring devices, symbol schedule, fixture schedule, wireways/junction boxes etc. Plans should have SYMBOLS, RISER DIAGRAMS, ABBREVIATIONS, LEGEND, ELECTRICAL NOTES, LIGHTING SCHEDULE, etc. [New Orleans Amendments to the International Building Code 2009 edition Section 106.1.1 – Page 13]
a) PANEL SCHEDULE shall provide name, location, voltage, amp, Neutral mounting, enclosure, feed, braches, available Short Circuit currents, AIC rating [fully rated/series rated], access, circuit numbers, number of poles, load description, volt-amps etc.
b) The above plans and specifications shall bear a wet [live] seal and signed statement of a Louisiana Registered Electrical Engineer. [New Orleans Amendments to the International Building Code 2009 edition – articles 101.4.1, 106.1, 2701]
4. One line power riser diagrams as well as panel schedules shall provide details of available short circuit currents at service and secondary panels. Please show that interrupting currents of circuit breakers and fuses match with them as per NEC-2008 articles 110.9, 110.10, 240.12, 225.53, 230.82(3), 230.205(B), 240.92(C)(1) and 230.208.
5. If total Electrical Work [MATERIAL & LABOR] done under this permit is less than $15,000, then please provide an Electrical estimate of this job from an electrician who is licensed with the City of New Orleans [New Orleans Amendments to the International Building Code 2009 edition – articles 101.4.1, 106.1, 2701].
The estimate provided shall be written in the following format:
a. Written on paper with the letter-head of the electrician or his electrical contracting company.
b. Building Permit Number and the location address.
c. Actual details of electrical work that will be done under this building permit.
d. Estimated Bill shall consist of actual cost estimate of Labor and materials.
e. Signature, License Number of the electrician, address, phone number and today’s date. Electrician’s estimate shall describe the actual work and not to refer to any plans, in case the plans do not bear wet seals and signed statement of a Louisiana Registered Electrical Engine
|