| GIS Addressing | Resolved | Zoning Verification or Non-Conforming Use is needed before addressing can be reviewed.
Information on what we need and the application process is available at this link:https://nola.gov/next/safety-and-permits/topics/zoning-administration/zoning-verification/
|
| GIS Addressing | Resolved | Addressing needs to be updated.
For this type of property, we use one root address with the Subtype addresses Apt 1A, Apt 1B (First floor) and Apt 2A, Apt 2B (Second Floor), etc. You can also opt to use Apt 101, 102, 201, 202, etc
I have attached a form that I need completed. Please complete and return the last page only.
The first column of the table on the form is for the current meter addresses at Entergy. Please write them in exactly as Entergy has them.
The requested column (second column) is for the new, updated address.
The third column is for the respective meter numbers. |
| Zoning | Resolved | This appears that it may be a proposal for a small affordable multifamily development; please clarify intent. If so, please review requirements for 20.3.SSS DWELLING, SMALL MULTI-FAMILY AFFORDABLE, per http://czo.nola.gov/Article-20#20-3-SSS. Please contact Kelly Butler for further compliance requirements - kgbutler@nola.gov |
| Plan Review | Withdrawn | PLAN REVIEW:
This project has been reviewed by Building Plan Reviewer, Dominique Scott. For email correspondence, please send to dominique.scott@nola.gov
Note: Please make sure to email the reviewer if you upload any documents on OneStop. |
| Plan Review | Withdrawn | PLAN REVIEW:
All written responses to review comments must be on a document with a letterhead, signed, and sealed by the design professional of record, or revisions must be made to the stamped plans. "Will comply" by itself will not suffice to resolve any comment. |
| Plan Review | Resolved | PLAN REVIEW:
The maximum design load for any piling that reaches refusal in a GM-9 area is 4 tons as per table 1811.12.2.3 of the City of New Orleans Amendments to the 2021 IBC and the pile load capacity map at https://www.nola.gov/safety-and-permits/pile-load-capacity-maps/. (NOTE: Your project is located in Area GM-9.) Please revise. |
| Plan Review | Resolved | PLAN REVIEW:
Please revise the elevation drawings to properly reflect the required elevation for the structure in compliance with the BFE/ABFE requirements. Graphically indicate where the BFE of -2.0' NAVD will occur. |
| Plan Review | Resolved | PLAN REVIEW:
Provide one access panel for all under-floor spaces. Access panels shall be a minimum 18” x 24” in accordance with 2021 IRC, Sec. R408.4. Please revise. |
| Plan Review | Resolved | PLAN REVIEW:
Building materials below base flood elevation shall comply with Sec. R322.1.8 IRC 2021 ed. Please verify. |
| Plan Review | Resolved | PLAN REVIEW:
Plumbing is not allowed to be installed below base flood. Please verify no new plumbing will occur below base flood. |
| Plan Review | Resolved | PLAN REVIEW:
Two or more buildings on the same lot shall be regulated as separate buildings as per the 2021 IBC, Section 503.1.2. Please provide 6ft between the units (it's currently 4'-9") or provide fire resistance rated at 1-hr with exposure from both sides to one of the buildings. |
| Plan Review | Resolved | PLAN REVIEW:
New ground based or wall-mounted mechanical equipment (with less than 7 feet of vertical clearance) may be located in an interior side or rear yard and shall be located at least two (2) feet from a rear lot line and two (2) feet from any side lot line, where at least two (2) feet of that distance remains open to the sky. Please revise for the a/c units and include the distances from all property lines and nearby structures. |
| Plan Review | Resolved | PLAN REVIEW:
Please provide an electrical plan for the overall structure. |
| Plan Review | Resolved | PLAN REVIEW:
Windows where the bottom exposed edge is less than 36 inches above the plane of the adjacent walking surface of stairways require safety glazing in accordance to 2021 IRC, Section R308.4.6. Please revise. |
| Plan Review | Withdrawn | PLAN REVIEW:
Provide dimensions of guard openings to verify that such openings shall not allow passage of a 4” sphere in compliance with IRC 2021, Section R312.1.3. |
| Plan Review | Resolved | PLAN REVIEW:
Please confirm compliance with the 2021 International Energy Conservation Code (2021 IECC) and State amendments adopted on July 1, 2023.
Information on Construction Documents (Sec. R103.2)
For new construction, additions, or substantial renovation, please provide details on the construction documents (e.g. in table format) including the following information, as applicable:
1. Energy compliance path
2. Insulation material and their R-values
3. Fenestration U-factors and solar heat gain coefficients (SHGC)
4. Area-weighted U-factor and solar heat gain coefficient (SHGC) calculations
5. Mechanical system design criteria
6. Mechanical and service water heating systems and equipment types, sizes, and efficiencies
7. Equipment and system controls
8. Duct sealing, duct, and pipe insulation and location
9. Air sealing details
Total Building Performance-Based Compliance Alternative (Sec. R405.2)
- Compliance based on total building performance analysis shall meet the requirements of Table R405.2
- Software tools (e.g. RESCheck) used for performance design shall be in accordance with Sec. R405.3.1.
o (Note: For more information and downloadable REScheck software, go to https://www.energycodes.gov/rescheck)
- For permit application, a report that complies with Sec. R405.3.2.1
- For certificate of occupancy, a compliance report that complies with Sec. R405.3.2.2
Energy Rating Index (ERI) Compliance Alternative (Sec. R406)
- Compliance based on Energy Rating Index (ERI) analysis shall meet the requirements of Sec. R406.2, including
o ERI requirements of 2021 IECC sections indicated within Table R406.2
o Maximum ERI (per climate zone) of Table R406.5
Prescriptive Compliance Alternative (Sec. R401.2)
- Prescriptive compliance alternative requires compliance with Sections R401 thru R404
- Section R402 insulation compliance can be met in one of three ways:
o Assembly U-factor compliance per Section R402.1.2
o R-value per Section R402.1.3; or
o Total UA compliance per Section R402.1.5 |
| Plan Review | Resolved | PLAN REVIEW:
Please provide Manuals S, D, and J calculations for review. |
| Plan Review | Resolved | PLAN REVIEW:
Note, blower door test documentation will need to be submitted prior to the closing of a building permit. |
| Plan Review | Resolved | PLAN REVIEW:
For any NEW/REPLACEMENT/RELOCATED PLUMBING FIXTURES: Submit a floor plan and riser diagram in PDF format for review/approval by SWBNO (Environmental Affairs). Any questions or for more information on the SWBNO backflow prevention program, contact Kenneth Boissiere at kboissiere@swbno.org or 504-585-2160. |
| Plan Review | Resolved | PLAN REVIEW:
Do you mean to use r-60 for your ceiling insulation value in the RESCheck? (Note, the required value is r-38.) |