| Commercial Wood Framing |
5/17/2024 |
Passed |
- Attic access including mechanical equipment access
- Blocking, caulking as required
- Double top plates, and headers
- I-joist installations
- Fire prevention systems roughed in
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Roof complete and moisture barriers installed
- Rough-ins not damaging framing
- Sheathing
- Joist bearing, lapping
- Purlins and struts
- Trusses
- Rough-in inspections approved
- Holdowns and hardware, fasteners,strap anchors, fasteners
- Ceiling height 7'-6"
- Special inspections document, if applicable
- Photos taken
- Window hill heights do not exceed EERO requirements
- Stairs complete with guards, rails and details correct
- Fasteners, lumber grades, load path, stud sizes, notching, boring at floors, walls, ceilings, roof
- Window sill heights not exceeding EERO requirements
|
| Commercial Wood Framing |
10/7/2024 |
Passed |
|
| Commercial Wood Framing |
10/8/2024 |
Scheduled |
- Attic access including mechanical equipment access
- Blocking, caulking as required
- Double top plates, and headers
- I-joist installations
- Fire prevention systems roughed in
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Roof complete and moisture barriers installed
- Rough-ins not damaging framing
- Sheathing
- Joist bearing, lapping
- Purlins and struts
- Trusses
- Rough-in inspections approved
- Holdowns and hardware, fasteners,strap anchors, fasteners
- Ceiling height 7'-6"
- Special inspections document, if applicable
- Photos taken
- Window hill heights do not exceed EERO requirements
- Stairs complete with guards, rails and details correct
- Fasteners, lumber grades, load path, stud sizes, notching, boring at floors, walls, ceilings, roof
- Window sill heights not exceeding EERO requirements
|
| Commercial Wood Framing |
10/8/2024 |
Passed |
- Attic access including mechanical equipment access
- Blocking, caulking as required
- Double top plates, and headers
- I-joist installations
- Fire prevention systems roughed in
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Roof complete and moisture barriers installed
- Rough-ins not damaging framing
- Sheathing
- Joist bearing, lapping
- Purlins and struts
- Trusses
- Rough-in inspections approved
- Holdowns and hardware, fasteners,strap anchors, fasteners
- Ceiling height 7'-6"
- Special inspections document, if applicable
- Photos taken
- Window hill heights do not exceed EERO requirements
- Stairs complete with guards, rails and details correct
- Fasteners, lumber grades, load path, stud sizes, notching, boring at floors, walls, ceilings, roof
- Window sill heights not exceeding EERO requirements
|
| Commercial Wood Framing |
11/7/2024 |
Passed |
- Attic access including mechanical equipment access
- Blocking, caulking as required
- Double top plates, and headers
- I-joist installations
- Fire prevention systems roughed in
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Roof complete and moisture barriers installed
- Rough-ins not damaging framing
- Sheathing
- Joist bearing, lapping
- Purlins and struts
- Trusses
- Rough-in inspections approved
- Holdowns and hardware, fasteners,strap anchors, fasteners
- Ceiling height 7'-6"
- Special inspections document, if applicable
- Photos taken
- Window hill heights do not exceed EERO requirements
- Stairs complete with guards, rails and details correct
- Fasteners, lumber grades, load path, stud sizes, notching, boring at floors, walls, ceilings, roof
- Window sill heights not exceeding EERO requirements
|
| Commercial Final C/O Documents |
|
Passed |
- CPC requirements met
- BZA requirements met
- Piling Affidavit (PAF) submitted
- Survey submitted and setbacks verified
- HDLC/VCC Final, if applicable
- Grading certificate submitted
- Federal elevation certificate submitted
- State Fire Marshal (SFM) final inspection report
- Department of Health (DHH) final inspection report
- Special inspections document, if applicable
- Photos taken of interior and exterior (all sides)
|
| Commercial Final C/O Inspection |
1/24/2025 |
Passed |
- Exterior fire-rated assemblies complete
- Interior fire-rated assemblies complete
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Smoke and/or CO detectors installed
- Photos taken of interior and exterior (all sides)
- Stairs complete, guards and rails and details correct, 6'-8" clear
- Safety glazing as required in hazardous locations
- Window sill height and size correct per EERO requirements
- Minimum ceiling height of 7'-0"
- Flood vents for enclosures below BFE or dry WP
- Insulation
- Discuss documentation requirements
|
| Commercial Final C/O Inspection |
1/24/2025 |
Passed |
- Exterior fire-rated assemblies complete
- Interior fire-rated assemblies complete
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Smoke and/or CO detectors installed
- Photos taken of interior and exterior (all sides)
- Stairs complete, guards and rails and details correct, 6'-8" clear
- Safety glazing as required in hazardous locations
- Window sill height and size correct per EERO requirements
- Minimum ceiling height of 7'-0"
- Flood vents for enclosures below BFE or dry WP
- Insulation
- Discuss documentation requirements
|
| Commercial Final C/O Inspection |
1/24/2025 |
Passed |
- Exterior fire-rated assemblies complete
- Interior fire-rated assemblies complete
- Check permit placard and photo of City-approved stamped plans, with revisions if needed
- Smoke and/or CO detectors installed
- Photos taken of interior and exterior (all sides)
- Stairs complete, guards and rails and details correct, 6'-8" clear
- Safety glazing as required in hazardous locations
- Window sill height and size correct per EERO requirements
- Minimum ceiling height of 7'-0"
- Flood vents for enclosures below BFE or dry WP
- Insulation
- Discuss documentation requirements
|